AS/NZS 4755.3.2:2012

$149.01

Demand response capabilities and supporting technologies for electrical products, Part 3.2: Interaction of demand response enabling devices and electrical products — Operational instructions and connections for devices controlling swimming pool pump-units

This Standard defines a set of operational instructions that will meet the requirements of remote agents wishing to control the energy consumption of pump-units, and establishes a consistent approach to the method of connecting the demand response interface to the demand response enabling device (DRED).

Table of contents
Header
About this publication
Preface
1 Scope and general
1.1 Scope
1.2 Referenced documents
1.3 Definitions
2 Operational instructions and demand response modes
2.1 General principles
2.2 Demand response modes
2.3 Manual override
2.4 Automatic override
2.5 Response times
2.6 Operation of auxiliary equipment
2.7 Run-time adjustment
2.8 Standby power
3 Interfaces
3.1 General
3.2 Physical interfaces
3.3 Terminal block
3.3.1 Terminal block pin assignments
3.3.2 Terminal block specifications
3.4 RJ45 socket
3.4.1 RJ45 socket pin assignment
3.4.2 RJ45 socket specifications
3.5 Circuit to dred
3.6 Optional electrical supply
3.7 Location and access
4 Labelling and marking of demand response capability
4.1 General
4.2 Registration
4.3 Point of sale labelling
4.4 Marking
4.5 Manufacturer’s literature
5 Testing and verifying demand response capability
5.1 Verification of claimed demand response capability
5.2 Set-up for testing
5.3 Verification of claimed compliance with DRM 1
5.3.1 Sequence of operations
5.3.2 Integral pump-unit controller
5.3.2.1 Interrupting operation during a DRM 1 event
5.3.2.2 Switching on during a DRM 1 event
5.3.3 Separate pump-unit controller
5.3.3.1 Interrupting operation during a demand response event
5.3.3.2 Switching on during a DRM 1 event
5.4 Verification of claimed compliance with DRM 2
5.4.1 Integral pump-unit controller
5.4.1.1 Interrupting operation during a DRM 2 event
5.4.1.2 Switching on during a DRM 2 event
5.4.2 Separate pump-unit controller
5.4.2.1 Interrupting operation during a DRM 2 event
5.4.2.2 Switching on during a DRM 2 event
5.5 Verification of claimed compliance with DRM 4
5.5.1 Interrupting operation during a DRM 4 event
5.5.2 Switching on during a DRM 4 event
5.6 Test report
Appendix A
Appendix B

Cited references in this standard
Content history
DR AS/NZS 4755.3.2

Please select a variation to view its description.

Published

17/05/2012

Pages

30

Please select a variation to view its pdf.

AS/NZS 4755.3.2:2012
$149.01