The objective of this revision is to amalgamate the two parts of the 2003 standard to provide manufacturers, designers, users, statutory authorities and others with comprehensive requirements for the design, construction, installation, testing and maintenance of spray painting booths, spray painting areas and mixing rooms.
Table of contents
Header
About this publication
Preface
1 Scope and general
1.1 Scope
1.2 Normative references
1.3 Terms and definitions
1.4 Spray painting hazards and arrangements
1.4.1 Spray painting hazards
1.4.2 Spray painting arrangements
1.4.3 Spray painting booths
1.4.4 Airflow systems for spray booths
1.4.4.1 General
1.4.4.2 Full down draught system
1.4.4.3 Semi down draught system
1.4.4.4 Cross flow system
1.4.4.5 On floor down draught systems
1.4.5 Designated spray painting areas
1.5 Documentation
1.6 Qualifications of personnel
1.7 Environmental conditions and other external influences
2 Spray booth design and construction
2.1 General
2.2 Materials
2.3 Expansion
2.4 Doors
2.4.1 General
2.4.2 Emergency exits
2.5 Entry/exit of tunnel or production booths
2.5.1 General
2.5.2 Emergency exits
2.6 Interior surfaces
2.7 Glazing
2.8 Shelves
2.9 Guarding of moving parts
2.10 Potential equalization
2.11 Electrical equipment
2.11.1 General
2.11.2 Equipment for use in the hazardous area
2.11.3 Luminaires
2.12 Electric filament infrared heating (IR)
2.13 Radiation paint curing
2.14 Ventilation design
2.14.1 General
2.14.2 Monitoring apparatus
2.14.3 Spray cycle airflow rate
2.14.4 Bake cycle airflow rate (including IR bake)
2.14.5 Purge
2.14.6 Failure of the ventilation system
2.15 Ventilation controls
2.15.1 General
2.15.2 Prior to spraying
2.15.3 Following spraying — Without baking
2.15.4 Following spraying — With baking
2.15.5 Baking that does not immediately follow after a spray cycle
2.15.6 Ventilation system with more than one fan
2.16 Exhaust air
2.16.1 Exhaust air outlets
2.16.2 Exhaust fans
2.16.3 Exhaust air cleaning
2.17 Ducts
2.18 Operating cycle
2.19 Heating systems
2.19.1 Permitted types
2.19.2 System requirements
2.19.3 Heat exchangers
2.19.4 Heat exchanger flues
2.19.5 Inspection of heat exchangers
2.19.6 Heating controls
3 Marking
4 Tests
4.1 Purpose
4.2 Documentation
4.3 Functional test
4.4 Ventilation system test
4.5 Airflow test
5 Maintenance
5.1 General
5.2 Routine tests
5.3 Modifications and alterations
Appendix A
A.1 General
A.2 Construction
A.3 Electrical equipment and bonding
A.4 Authorization
A.5 Documentation
A.6 Personnel requirements
A.7 Personal protective equipment (PPE)
A.8 Security and access
A.9 Clean up procedure
Appendix B
B.1 Types of paint mixing rooms
B.2 Design and construction
B.2.1 General
B.2.2 Materials
B.2.3 Doors
B.2.4 Interior surfaces
B.2.5 Glazing
B.2.6 Shelves
B.2.7 Ducts
B.2.8 Guarding of moving parts
B.2.9 Ventilation arrangement
B.3 Classification of hazardous areas within paint mixing rooms