Sets out procedures for the installation of premoulded fibre-reinforced plastic swimming pools complying with the requirements of AS/NZS 1838:1994, for above and below ground locations.
Table of contents
Header
About this publication
PREFACE
1 SCOPE
2 REFERENCED DOCUMENTS
3 STORAGE, HANDLING AND TRANSPORT OF POOLS
4 INSTALLATION CRITERIA
4.1 Condition of the pool at the point of delivery
4.2 Imposed loads
4.3 Bottom load
4.4 Movement of sub-surface water
5 MATERIALS
5.1 Bedding
5.2 Backfill
6 EXCAVATION FOR POOLS IN THE GROUND
6.1 Support during excavation
6.1.1 Permanent support
6.1.2 Temporary support
6.1.3 Easements
6.2 Excavation profile
7 INSTALLATION OF POOLS IN THE GROUND
7.1 Deflection limits
7.1.1 Overall variation
7.1.2 Deviations from pool shape (internal surface)