AS/NZS 1839:1994

$50.39

Swimming pools — Premoulded fibre-reinforced plastics — Installation

Sets out procedures for the installation of premoulded fibre-reinforced plastic swimming pools complying with the requirements of AS/NZS 1838:1994, for above and below ground locations.

Table of contents
Header
About this publication
PREFACE
1 SCOPE
2 REFERENCED DOCUMENTS
3 STORAGE, HANDLING AND TRANSPORT OF POOLS
4 INSTALLATION CRITERIA
4.1 Condition of the pool at the point of delivery
4.2 Imposed loads
4.3 Bottom load
4.4 Movement of sub-surface water
5 MATERIALS
5.1 Bedding
5.2 Backfill
6 EXCAVATION FOR POOLS IN THE GROUND
6.1 Support during excavation
6.1.1 Permanent support
6.1.2 Temporary support
6.1.3 Easements
6.2 Excavation profile
7 INSTALLATION OF POOLS IN THE GROUND
7.1 Deflection limits
7.1.1 Overall variation
7.1.2 Deviations from pool shape (internal surface)
7.2 Pool drainage
7.2.1 Height of coping
7.2.2 Drainage around pools
7.2.3 Fully piped subsoil drainage
7.2.4 Bedding
7.2.5 Hydrostatic valve
7.2.6 Standpipe
7.3 Site work
7.4 Placement and backfilling of pool
7.5 Final level of pool
7.6 Concrete bond beam
8 INSTALLATION OF POOLS ABOVE THE GROUND
8.1 General
8.2 Base preparation
8.3 Bedding
8.4 Final level of pool
9 POOL-ASSOCIATED SERVICES
9.1 Electrical connections
9.2 Plumbing
9.3 Skimmer boxes
9.4 Fencing (for New Zealand application only)
10 OPERATING INSTRUCTIONS

Cited references in this standard
Content history

[Current]

[Superseded]

DR 93283

Please select a variation to view its description.

Published

14/11/1994

Pages

9

Please select a variation to view its pdf.

AS/NZS 1839:1994