The objective of this Standard is to specify requirements, test methods and performance criteria for power supply equipment (PSE) for use in fire detection and alarm systems installed in buildings.
Table of contents
Header
About this publication
Preface
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and abbreviated terms
4.1 Symbols
4.2 Abbreviated terms
5 Requirements
5.1 General
5.1.1
5.1.2
5.2 Compliance
5.2.1
5.2.2
5.2.3
5.3 Power sources
5.3.1 General
5.3.1.1
5.3.1.2
5.3.1.3
5.3.1.4
5.3.2 Main power source
5.3.2.1
5.3.2.2
5.3.2.3
5.3.2.4
5.3.3 Standby power source
5.3.3.1
5.3.3.2
5.3.3.3
5.3.3.4
5.3.3.5
5.4 Charger
5.4.1
5.4.2
5.4.3
5.5 Faults
5.5.1
5.5.2
5.5.3
5.6 Mechanical
5.6.1
5.6.2
5.6.3
5.6.4
5.6.5
5.6.6
5.7 Power supply interface
5.8 Software
5.8.1 General
5.8.2 Program monitoring
5.8.2.1
5.8.2.2
5.8.2.3
5.8.2.4
5.8.3 Storage of programs and data
5.8.3.1
5.8.3.2
5.8.4 Monitoring of memory contents
6 Tests
6.1 General
6.1.1 Standard atmospheric conditions for testing
6.1.2 Mounting and orientation
6.1.3 Electrical connection
6.2 Functional tests
6.2.1 The object of test
6.2.2 Test schedule
6.2.2.1
6.2.3 Full functional test
6.2.3.1 Object of the test
6.2.3.2 Procedure for non-integrated PSE
6.2.3.2.1
6.2.3.2.2
6.2.3.2.3
6.2.3.2.4
6.2.3.3 Requirements for non-integrated PSE
6.2.3.3.1
6.2.3.3.2
6.2.3.3.3
6.2.3.4 Procedure for integrated PSE
6.2.3.4.1
6.2.3.4.2
6.2.3.4.3
6.2.3.4.4
6.2.3.5 Requirements for integrated PSE
6.2.3.5.1
6.2.3.5.2
6.2.4 Reduced functional test
6.2.4.1 Object of the test
6.2.4.2 Procedure for non-integrated PSE
6.2.4.3 Requirements for non-integrated PSE
6.2.4.4 Procedure for integrated PSE
6.2.4.5 Requirement for integrated PSE
6.3 Charger and the standby power source test
6.3.1 Test procedure
6.3.1.1
6.3.1.2
6.3.1.3
6.3.1.4
6.3.1.5
6.3.2 Requirements
6.3.2.1
6.3.2.2
6.4 High battery impedance test
6.4.1 Object of test
6.4.2 General
6.4.3 Test procedure for non-integrated PSE
6.4.3.1
6.4.3.2
6.4.3.3
6.4.3.4
6.4.3.5
6.4.3.6
6.4.3.7
6.4.4 Requirements for integrated PSE
6.4.4.1
6.4.4.2
6.4.5 Test procedure for integrated PSE
6.4.5.1
6.4.5.2
6.4.5.3
6.4.5.4
6.4.5.5
6.4.5.6
6.4.5.7
6.4.6 Requirements for integrated PSE
6.4.6.1
6.4.6.2
6.5 Environmental tests
6.5.1 General
65.1.1
6.5.1.2
6.5.1.3
6.5.2 Tests for one specimen
6.5.2.1
6.5.2.2
6.5.3 Tests for more than one specimen
6.5.3.1
6.5.3.2
6.5.3.3
6.5.4 Requirements
6.5.4.1
6.5.4.2
6.6 Cold (operational)
6.6.1 Object of test
6.6.2 Test procedure
6.6.2.1 General
6.6.2.2 Initial examination
6.6.2.3 State of specimen during conditioning
6.6.2.4 Conditioning
6.6.2.5 Measurements during conditioning
6.6.2.5.1
6.6.2.5.2
6.6.2.6 Final measurements
6.6.3 Requirements
6.6.3.1
6.6.3.2
6.7 Damp heat, steady-state (operational)
6.7.1 Object of test
6.7.2 Test procedure
6.7.2.1 General
6.7.2.2 Initial examination
6.7.2.3 State of specimen during conditioning
6.7.2.4 Conditioning
6.7.2.4.1
6.7.2.4.2
6.7.2.5 Measurements during conditioning
6.7.2.5.1
6.7.2.5.2
6.7.2.6 Final measurements
6.7.3 Requirements
6.7.3.1
6.7.3.2
6.8 Impact (operational) — Optional test
6.8.1 Object of test
6.8.2 Test procedure
6.8.2.1 General
6.8.2.2 Initial examination
6.8.2.3 State of specimen during conditioning
6.8.2.4 Conditioning
6.8.2.4.1
6.8.2.4.2
6.8.2.4.3
6.8.2.4.4
6.8.2.5 Measurements during conditioning
6.8.2.6 Final measurements
6.8.3 Requirements
6.8.3.1
6.8.3.2
6.9 Vibration, sinusoidal (operational) — Optional test