AS 4817: 01/01/2003 Project performance measurement using Earned Value
Original price was: $97.17.$46.40Current price is: $46.40.
Project performance measurement using Earned Value 01/01/2003
ISBN(s): 0733750370
Specifies requirements and gives guidance for the measurement and reporting of schedule and cost performance of projects and programs using the Earned Value Performance Measurement EVPM method. EVPM is a method for measuring and reporting project performance, and forcasting future performance based on past performance.
Attributes
| Edition | 1st |
|---|---|
| Published | 01/01/2003 |
| ISBN(s) | 0733750370 |
| Number of Pages | 44 |
| File Size | 1 file, 1000 KB |
| Product Code(s) | 10168606, 10168635, 10168618 |
| Note | This product is unavailable in Ukraine, Russia, Belarus |





