AS 3610-1995

$170.80

Formwork for concrete

Specifies requirements for the design, fabrication, erection and stripping of formwork as well as the evaluation and repair of the formed concrete surface. Colour evaluation charts are included in an Appendix. With the publication of AS 3610.1:2018, that publication stated that: “The full review of AS 3610 series is in progress and therefore it was considered appropriate to issue the Standard in two Parts: AS 3610.1, Formwork for concrete, Part 1: Formwork specification (this Standard), focuses on surface finish and covers various types of documentation applicable to formwork. This Part was revised and published in 2010. This latest revision includes relevant commentary clauses from AS 3610 Supplement 2—1996 Formwork for concrete—Commentary; AS 3610.2, will cover aspects of formwork and falsework design, construction and testing, including Section 4 of AS 3610.1—2010. NOTE: At the time of publication (16 April 2018), AS 3610-1995 is still under review. AS 3610.2, AS 3610—1995 and AS 3610.1 will coexist. Sections 2, 3 and 5 in this Standard (AS 3610.1:2018) supersede Sections 2 and 3, as well as Clauses 4.7 and 6 of AS 3610—1995.”

Table of contents
Header
About this publication
Preface
1 General
1.1 Scope

view more

Cited references in this standard

[Available Superseded]

Minimum design loads on structures (known as the SAA Loading Code), Part 2: Wind loads

[Current]

Structural design actions, Part 4: Earthquake actions in Australia

[Superseded]

Code of practice for metal scaffolding (known as the SAA Metal Scaffolding Code)

[Current]

Fixed platforms, walkways, stairways and ladders – Design, construction and installation

[Superseded]

Rules for the use of aluminium in structures — Interpretation No:1

view more

Content history

[Available Superseded]

[Superseded]

Please select a variation to view its description.

Published

05/04/1995

Pages

70

Please select a variation to view its pdf.

AS 3610-1995
$170.80