AS 3011.1:2019

$87.70

Electrical installations – Secondary batteries installed in buildings, Part 1: Vented cells

The objective of this Standard is to specify minimum requirements for the installation of vented lead acid batteries and vented alkaline batteries to ensure safety from fire and electric shock.

Table of contents
Header
About this publication
Preface
Introduction
1 Scope and general
1.1 Scope
1.2 Normative references
1.3 Terms and definitions
2 General requirements
2.1 General
2.1.1 Hydrogen emission
2.1.2 Alarms
2.1.3 Battery accommodation
2.1.4 Arrangement of cells
2.1.5 Ventilation
2.2 Battery room requirements
2.2.1 General
2.2.2 Battery room layout and floor area
2.2.3 Take-off battery terminals and outgoing busbars and cables
2.2.4 Inter-tier and inter-row connections
2.2.5 Inter-cell connectors
2.2.6 Luminaires
2.2.7 Location of general purpose outlets
2.3 Battery enclosure requirements
2.3.1 Enclosure construction
2.3.2 Take-off battery terminals and outgoing busbars and cables
2.3.3 Battery compartment circuits
3 Installation
3.1 General
3.2 Connections
3.3 Protection
3.3.1 Overcurrent protection
3.3.2 Warning notices
3.3.3 Switchgear
3.3.4 Earth-leakage detection
3.3.5 Main isolating switch
3.3.6 Section isolating equipment
3.3.7 Fire safety and warning signs
Appendix A
Bibliography

Cited references in this standard
Content history

[Available Superseded]

DR AS 3011.1:2019

Please select a variation to view its description.

Published

20/12/2019

Pages

10

Please select a variation to view its pdf.

AS 3011.1:2019
$87.70