AS 2806.2-1985

$70.15

Aluminium ores — Sampling, Part 2: Sampling from stationary situations

Sets out procedures for the sampling of aluminium ore from stockpiles, wagons, trucks, ships’ holds and stopped conveyor belts. The procedure was prepared at the request of the aluminium ore industry to fulfil a vital need for the standardization of sampling procedures used in the industry.

Content history

Please select a variation to view its description.

Published

01/01/1985

Pages

12

Please select a variation to view its pdf.

AS 2806.2-1985
$70.15