   1 Scope and general
  
   1.1 Scope
  
   1.2 Application
  
   1.3 Normative references
  
   1.4 Terms and definitions
  
   2 Design considerations for direct current systems using batteries
  
   2.1 General
  
   2.2 Battery size and type (nominal voltage and rated capacity)
  
   2.3 Method of connection
  
   2.4 Operating conditions
  
   2.5 Battery short-circuit current
  
   2.6 Voltage drop
  
   2.7 Connection between battery and direct current switchboard
  
   2.7.1 General
  
   2.7.2 Cables
  
   2.7.3 Busbars
  
   2.7.4 Busways
  
   2.8 Direct current switchboards
  
   2.9 Terminals and connectors
  
   2.10 Direct current systems — earthing and earth-fault detection
  
   2.11 Earth-fault location
  
   2.12 Protection of batteries and direct current circuits
  
   2.13 Alarms
  
   2.14 Dual battery system
  
   3 Battery accommodation
  
   3.1 General
  
   3.2 Layout and location
  
   3.3 Ventilation
  
   3.3.1 General
  
   3.3.2 Rate of ventilation
  
   3.3.3 Charging rate
  
   3.3.4 Method of ventilation
  
   3.3.4.1 General
  
   3.3.4.2 Natural ventilation
  
   3.3.4.3 Mechanical ventilation
  
   3.3.4.4 Arrangement of ventilation
  
   3.4 Access
  
   3.4.1 General
  
   3.4.2 Battery rooms or areas restricted to authorized personnel
  
   3.4.3 Battery enclosures
  
   3.5 Floor loadings
  
   3.6 Battery enclosure construction
  
   3.7 Lighting and power
  
   3.8 Safety signs
  
   3.9 Arrangement of cells or monobloc
  
   3.10 Battery stands
  
   4 Charging
  
   4.1 General
  
   4.2 Charging parameters
  
   4.3 Charging time
  
   5 Installation and commissioning
  
   5.1 Receipt inspection
  
   5.2 Unpacking
  
   5.3 Storage
  
   5.4 Mounting and connection
  
   5.5 Commissioning
  
   5.5.1 Initial charge
  
   5.5.2 Inter-cell voltage
  
   5.5.3 Performance test
  
   5.5.4 Cell voltage test
  
   5.6 Records
  
   6 Inspection and maintenance
  
   6.1 Inspection
  
   6.1.1 General
  
   6.1.2 Test equipment
  
   6.1.3 Inspection schedule
  
   6.1.3.1 Quarterly
  
   6.1.3.2 Yearly
  
   6.1.4 Performance tests
  
   6.1.5 Abnormal conditions
  
   6.2 Records
  
   6.3 Pilot cells
  
   6.4 Maintenance
  
   6.4.1 Routine maintenance
  
   6.4.2 Level of float voltage
  
   6.4.3 Cell voltage
  
   6.4.3.1 Lead-acid cells
  
   6.4.3.2 Nickel-cadmium cells
  
   6.4.4 Cycling of nickel-cadmium batteries
  
   7 Testing
  
   7.1 General
  
   7.2 Capacity test schedule
  
   7.2.1 Performance
  
   7.2.2 Service
  
   7.3 Design considerations for a capacity tester
  
   7.4 Procedure for battery capacity tests
  
   7.4.1 Type of test
  
   7.4.2 Initial conditions
  
   7.4.3 Test duration
  
   7.4.4 Performance test
  
   7.4.5 Service test
  
   7.5 Battery replacement criteria
  
   8 Safety
  
   8.1 General
  
   8.2 Protective equipment
  
   8.3 Safety signs
  
   8.4 Precautions
  
   8.4.1 General
  
   8.4.2 During installation
  
   8.4.3 During maintenance
  
   8.5 Firefighting equipment
  
   Appendix A
  
   A.1 Scope
  
   A.2 Principle
  
   A.3 Procedure
  
   A.4 Report
  
   Appendix B
  
   Appendix C
  
   Appendix D
  
   Appendix E
  
   E.1 Scope
  
   E.2 Condition on delivery
  
   E.3 Initial charging
  
   E.4 Service test
  
   E.5 Inter-cell connections
  
   Appendix F
  
   F.1 Scope
  
   F.2 Condition on delivery
  
   F.3 Initial charging
  
   F.4 Service test
  
   F.5 Inter-battery unit connections
  
   Appendix G
  
   Appendix H
  
   H.1 Scope
  
   H.2 Principle
  
   H.3 Preparation
  
   H.4 Procedure
  
   H.5 Calculation
  
   H.6 Report
  
   Bibliography