AS 2419.3-2012

$177.61

Fire hydrant installations, Part 3: Fire brigade booster connections

Sets out requirements for the design, manufacture, performance and testing of booster connections suitable for installations in fire hydrant systems and sprinkler systems.

Table of contents
Cited references in this standard
Content history

[Superseded]

DR AS 2419.3

Please select a variation to view its description.

Published

07/06/2012

Pages

31

Please select a variation to view its pdf.

AS 2419.3-2012
$177.61